Case Study: Strategic Aeronautical Site Needs Temporary Power Station

Strategic Aeronautical Site Needs Temporary Power Station

The Challenge for the Customer

When a critical defense aeronautics facility was in need of a temporary power station, they wanted a partner who would be absolutely professional, reliable and thorough – ensuring successful project implementation. There was too much at stake to settle for anything less.

The client needed a 4MW generator rental system that would run between 12 and 24 hours over a weekend. They needed a turnkey operation, with the vendor capable of managing generators, fueling, freight and crane service, high voltage connections, and a high voltage resistive load bank test.

Aggreko's Solution

As soon as the bids came in, the client chose Aggreko due to their professionalism and a comprehensive proposal providing all the ancillary services the client had requested.

Once selected, Aggreko continued to provide this client with peace of mind, adapting to numerous scheduling and scope changes. The team also arranged to load equipment onsite two weeks before the shutdown to assure the customer that everything would be ready with plenty of time to spare.

When the shutdown finally took place in the heat of June, it had a new estimated duration of up to 48 hours. Aggreko was able to accommodate the change – not only providing the equipment necessary even during peak season, but also ensuring continuous fueling was available for the duration.

The Benefit to the Customer

From the initial walk-through to the bid and negotiation stage through the hours of operation, the Aggreko team delivered exactly what the client needed, when they needed it.