Supplemental Cooling | Temporary Cooling Tower Rental | Aggreko

Supplemental Cooling with Cooling Tower Rentals

Rental cooling towers can increase capacity & reduce cold water temps

Productivity can suffer due to the limited capacity of permanent cooling towers, especially during the hot summer months. Aggreko’s temporary cooling towers can be used along with your permanent cooling towers to increase capacity and reduce cold water temperatures, keeping productivity at maximum levels and providing you with the supplemental cooling you need.  

Two Ways Aggreko Can Provide Supplemental Cooling   

The first way to augment cooling tower capacity is by diverting a portion of the hot water from the primary cooling tower, sending it to the rental tower(s) where it is then cooled and redeposited into the cold water basin of the primary tower.

Our experienced technical sales personal are equipped with the necessary software to model the performance of the existing tower and precisely determine the amount of augmentation required to achieve the desired results. The water and thermal balance between the primary and rental cooling towers are crucial to achieving maximum results.

Aggreko’s unique elevated water basin can supply up to 14 feet of positive head that allows us to return the cooled water to the basin of the primary cooling tower without the need for additional pumping or the balancing and reliability nightmares that comes with operating a dual pumping system.

The second way Aggreko provides supplemental cooling is by isolating a particular exchanger or group of exchangers from the primary cooling tower and placing it on a rental tower(s) that is sized specifically to achieve the ideal temperatures. When a particular exchanger, or group of exchangers, is limited by temperatures and water flow, temporary cooling towers can supply the cool water needed for optimum performance. Aggreko can isolate those units and complement them with temporary cooling towers so that the lack of cool water is not an issue.

This supplemental cooling process not only provides benefit to the exchanger(s) that is isolated but, by reducing the heat load and water flow requirements of the primary cooling tower and pumps, the water temperature to the remaining exchanger(s) is reduced and water flows are improved, achieving a more desirable operating condition.

For more information on our cooling tower options, visit the website for Aggreko Cooling Tower Services. You can also contact Aggreko Cooling Tower Services via email or call 877.550.COOL.

Contact us

877.603.2801

Send us your inquiry